Who:
Confidential
What:
Cable Percussive Drilling (Geotechnical)
Where:
M62 Motorway
How long:
1 week
Outcome:
Work completed safely and on time
THE PROJECT
D&I Drilling were commissioned to carry out overnight drilling to minimise impact to the local road network and avoiding direct drilling on the M62. The works were undertaken to ascertain ground conditions for a new gantry location.
THE SOLUTION
Cable percussive boreholes were drilled to circa 10mbgl to ascertain ground conditions. Strata was logged, geotechnical and contaminated soil samples were taken for the consultant, together with in-situ testing in the form of Standard Penetration Tests and careful monitoring and assessment of groundwater strike levels.
THE BENEFIT
Work was undertaken safely and on time.